Mt. Rushmore Road Update 2017/03/16 027C 049F

RAPID CITY, SD – Beginning Thursday, March 23, motorists can expect intermittent closures of the west half of the intersections of Mount Rushmore Road with Saint Cloud Street and Franklin Street for pavement removal. Saint Cloud Street will be closed from the Mount Rushmore Road intersection to the west approximately 180 feet. Franklin Street will be closed from the intersection of Mount Rushmore Road to the west approximately 80 feet. Each street will be closed intermittently as water and sewer lines are installed. Be advised that both streets may be closed at the same time.

Motorists are asked to slow down through the work zone and be prepared for: suddenly slowing, merging and stopped traffic, minor delays, loose gravel, uneven surfaces and bumps, as well as construction workers and equipment adjacent to the roadway.

Project information is available at www.mountrushmoreroad.com.

For questions, the public may contact Debby Heisinger at Ferber Engineering Company Inc. by phone (605) 343-3311 or email@ferberengineering.com.

Posted in Uncategorized

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

%d bloggers like this: